Case study 04 — Building & Public Works

Earthworks and paving of a courtyard

Reworking an inner courtyard: earthworks, falls, poured slab and large-format paving laid through to the edges.

Year
2024
Location
Abidjan
Division
Building & Public Works
Inner courtyard being paved, large-format tiles laid on a fresh slab

A

The context

An earth courtyard between two walls, which turns to mud with every rainy season. The problem is not the surface — it is the fall: without falls set correctly, water sits under the paving and lifts it within a year.

The brief Make the courtyard usable and take the rainwater away, with nothing to put right at the next season.


B

What was delivered

  • 01 Excavation and removal of spoil.
  • 02 Falls set towards the outfall, hardcore and compaction.
  • 03 Slab poured, reinforced and screeded.
  • 04 Large-format paving laid and grouted through to the edges, junctions with the walls detailed.

C

The outcome

Courtyard handed over usable, with a fall that carries water to the outfall. The edges are detailed right up to the face of the walls — that is where lifting starts when they are not.


D

In pictures

  • Inner courtyard excavated, spoil levelled before the slab is poured
    Excavation and setting out of the falls.
  • Slab being poured and floated at the far end of the courtyard
    Slab poured and screeded before laying.